Installation and design services available locally!

General

All About Laminate

All About Hardwood

Choosing Hardwood Flooring

» All About Wood Flooring  
» What type of finish for your hardwood floor?
» Wood Flooring Species
» Underlayment/Adhesives
» Pre-finished or site-finished hardwood floors?
» Design Elements

Pre-Installation Information

» Installation Methods
» Tools for Hardwood Flooring
» Moisture Testing
» Acclimation of Hardwood Floors To The Jobsite

Getting It Done

» Preparing the Room/Smoothing The Subfloor
» Dealing With Moisture
» Installation of Hardwood Floors On Concrete
» Installation Prefinished Nail or Staple Down
» Installation of Floating Hardwood Floor 
» Maintaining the Floor

Additional Articles

» Finish your Hardwood Floors on Site
» Restoring old hardwood Floors
   

All About Area Rugs

 
Return to shopping | ArticlesHelp Desk Home | FAQs
 


Acclimation of Hardwood Floors To The Jobsite

  • Tips for problem free installations.
  • Why some floors cup and others don't.
  • Gaps in winter months?

  • Acclimation to the installation environment for solid hardwood floors should never be overlooked. While it's not as important for engineered products due to the stability in the way they are constructed, solid products will expand and contract considerably, given the right conditions.Acclimating Hardwood Floors

    Following are some basic guidelines for a problem free installation: before during, and after.

    • Solid flooring should be delivered to the jobsite and allowed to acclimate to the conditions in which it will be installed or near occupancy levels. Temperature and humidity should be monitored.
    • Delivery should be after major projects have been completed and thoroughly dry, such as dry wall and masonry work. Doors and windows must be in. Testing of wood subfloors should be performed and not to exceed 12-14%
    • Drainage- It's vital the grading should be directed away from the home to prevent unnecessary moisture problems.
    • Basements and crawl spaces need proper ventilation. Polyethylene film of 6 mil in thickness must be used as a proper vapor barrier.

     


    COMPANY INFORMATION

      About us
    Contact us
    Acceptance Mark
     

    NEED MORE HELP ???

      Customer Service
    Returns & Exchanges
    Lowest Price Guarantee
    Shipping Methods/Charges
    Order Status/Charges

     

    SECURE SHOPPING

      Secure Purchasing
    Product Warranties
    Terms & Conditions
    Privacy Policy

    1197 E. Los Angeles Ave, Unit C2221, Simi Valley, CA 93065    Toll Free: 1-855-5 Floor1 (1-855-535-6671)

     security | contact us | site map | © Copyright 1998-2011 http://www.FloorOne.com